CAMARILLO, CA, Feb. 12, 2018 /CNW/ – BNK Petroleum Inc. (the “Company“) (TSX: BKX) is pleased to announce that the Company has drilled and set casing on the Glenn 16-2H well and begun drilling the WLC 14-1H well in the Company’s Tishomingo Field.
The Glenn 16-2H, which is located directly south of the Company’s Brock 9-2H well, was drilled and cased in 25 days. The drilling rig was moved 2 miles to the east and is drilling the WLC 14-1H well (previously referred to as the Scott 14-2H). Fracture stimulation bids for the Glenn 16-2H well have been received … Continue Reading